Keeping Norfolk Homes Beautiful...

Porcelain Bathroom








This project in Middleton required a complete bathroom re-fit. The old shower had leaked, damaging the floor and shower base. I removed all the old damp rotten floor and shower base, prepped and tanked the walls to take the new tiles, installed a new shower base and tray, tiled the room with porcelain and installed a new shower, shower door, bath, toilet & sink and replaced the plaster coving ready for final decoration by the client.
Existing Floor and shower rotten with damp from previous shower leak.
Old rotten floor and shower base removed and new flooring installed.
New Plywood shower tray base built and installed ready for new shower tray.
Rotten plasterboard removed, shower back wall re-lined with Hardiebacker-board ready for tanking.
Walls prepped, shower tray cemented in place and edges taped ready for tanking.
Tanking applied and first courses of Porcelain tiles installed.
Finished shower area, sealed, grouted, polished and edges siliconed ready for use.
Rest of the room tiled, sealed and grouted ready for use. New bath, toilet and sink installed.